Jump to content
About Feng Shui at Geomancy.Net
Sponsored Link
 

Recommended Posts


Dear FS Master,


May I know does a period 7 flat (a unit on the 10 floor) become a period 8 flat after the below changes:


1) A fresh coat of paint to all the walls, celing, main door and main gate.


2) Marble polishing at the living & dinning floorings, overlay new tiles at the kitchen, both toilets, store room and balcony. 3 bedrooms are laminted flooring, so can't change.


Appreciate your advise.


Thank you.


Link to post
Share on other sites

Sponsored Link
 
  • Staff

Dear Aloysius,


First, it is good to understand the symbolism called "removing the roof of the home".


For example, if we live in a landed property, often, if the owner removes the roof of the home (usually best if removed for 100 days) before putting the roof tiles back, it is like allowing "yang qi" e.g. daylight into the home. Thus, even if we do not do a major renovation for this home, and if we do say paint the entire home , the better. Here, such a home may be considered as having flown to a new Period 8 if it is currently a period 7 home. It is still good to have two or three celebrations after this to make sure the home has flown over to the new period.


However, for many who stay in an apartment. What happens? We cannot simply remove the roof of our apartment else above collapses over our home.


Under symbolism in Feng Shui, we should thus try to repaint the roof of the apartment e.g. in one session - not 24 hours but rather may take a few days or a week. This is symbolic of "removing" the roof of an apartment.


In addition, it is good to give the entire home a fresh coat of paint. And you can still do some of the works e.g. polishing the living room tiles etc...


In your case, you should try to have two or three celebrations in the home to bring in "yang qi" into the home. The above is the suggested way for you to fly to Period 8.

Warmest Regards,
Cecil


Quote:

Aloysius Chia wrote:


Dear FS Master,


May I know does a period 7 flat (a unit on the 10 floor) become a period 8 flat after the below changes:


1) A fresh coat of paint to all the walls, celing, main door and main gate.


2) Marble polishing at the living & dinning floorings, overlay new tiles at the kitchen, both toilets, store room and balcony. 3 bedrooms are laminted flooring, so can't change.



Master Cecil Lee, Geomancy.Net

Master Cecil Lee, Geomancy.Net
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...